„Hotel Pangratz“ St. Anton am Arlberg

Centrally located, in the middle of St. Anton, a new top-hotel with approx. 100 beds is developed. SHP is responsible for the entire plant design in the field of building services and electrical engineering as well as for the production monitoring. The production of heating energy of biomass is carried out CO2-neutrally. All ventilating systems are equipped with the most modern heat recovery.

The completion is planned for 2012.